1. Project Reports

Health Program

[1] NCD Project-3 Final Report (2022). Strengthening Counseling Corner in NCD Corner for Reducing Risk Due to Non-Communicable Diseases in Jashore District: Final Report (2019–2022). Asia Arsenic Network; Jashore, Bangladesh.https://aanbangladesh.org/wp-content/uploads/2026/11/03.-2019-2022-NCD-Project-3-Fincal-Report.pdf

[2] NCD Project-1 Final Report (2016). Risk Reduction of Non-Communicable Diseases in Jessore District: Final Report (2013–2016). Asia Arsenic Network; Jashore, Bangladesh.https://aanbangladesh.org/wp-content/uploads/2026/11/01.-2013-2016-NCD-Project-1-Final-Report-1.pdf

[3] NCD Project-2 Final Report (2019). Strengthening Community Capacity for Non-Communicable Disease Prevention in Khulna Division: Final Report (2016–2019). Asia Arsenic Network; Jashore, Bangladesh.https://aanbangladesh.org/wp-content/uploads/2026/11/02.-2016-2019-NCD-Project-2-Final-Report.pdf

[4] NCD Project-4 Report (2026). Advocacy for NCD Prevention and Continuty of Care to Reduce Premature Mortality- a colloborative approach involving Community, Government & NGOs:  Project Report (2025–2026). Asia Arsenic Network, Bangladesh [P-1~35, ISBN 978-984-35-9984-1].https://aanbangladesh.org/wp-content/uploads/2026/11/5.-AAN-NCD-Advocacy-Report-2026.pdf

  • Sustainable Arsenic Mitigation under Integrated Local Government System in Jessore
    • Project Report 1: Sustainable Arsenic Mitigation through Community Initiative and Local Government Support (February 2007)
    • Project Report 2: Suitability Evaluation of Alternative Water Sources (February 2007)
    • Project Report 3: Arsenic Mitigation through Community Initiative (in Bengali) (August 2007)
    • Project Report 4: Practice of Arsenicosis Patient Management (February 2008)
    • Project Report 5: Water Quality Monitoring System with Community Initiatives and Local Government Supports (June 2008)
    • Project Report 6: Safe Water Devices: Characterization and Maintenance (October 2008)
    • Project Report 7: Safe Water Supply through Local Government (October 2008)
    • Project Report 8: Community Development for Sustainable Safe Water Supply (November 2008)
    • Interim Report (September 2007)
    • Final Report (November 2008)
    • Handbook (in English) (September 2008)
    • Handbook (in Bengali) (September 2008)